Site Development Plans (SDPs)

Site Development Plans

Where Conditions Becomes a Layout

A Site Development Plan shows how a site as a whole will be developed — the building footprints and where they sit, the access and internal circulation, the parking, the refuse, the landscaping and the levels. It is usually imposed as a condition of a land use approval, and it is approved by the municipality’s planning department rather than by building control. That makes it a planning instrument prepared as an architectural drawing. It is assessed against the conditions attached to your approval, which means the approval has to be read before the layout is drawn. An architect who has not read it will draw a competent scheme answering the wrong requirements.

It's Not the Site Plan in Your Building Plans

The site plan is one sheet inside a building plan submission, assessed by building control. An SDP is a separate document, approved by the planning department, and it comes first. The two are confused constantly.

When One is Required

When You Need an SDP

An SDP is required where something says so — an approval, or the scheme itself. In our experience these are the four situations that bring it up.

Your approval imposes one

A rezoning, consent use or township approval carrying an SDP condition. Until the SDP is approved, the rest of the approval cannot be given effect.

The scheme requires one for your zoning

Some zonings carry an SDP requirement in the land use scheme itself, independent of any condition. It applies whether or not anyone mentioned it.

Building plans are being held up

Building control will not consider a set where an SDP was required and none has been approved. The SDP has to go first, and it is a different department.

The scheme has changed

A layout that has moved since approval — a different unit mix, a relocated access, revised parking — needs the SDP amended before the plans can follow it.

Read your conditions of approval before anything is drawn. They are the brief — the parking ratio, the buffers, the access position, the open space — and a layout produced without them is a layout that comes back. The document is a few pages and it is already in your file.

In Practice

The Schemes that Needs One

What the planner reads depends on what is being built. These five account for most of the SDPs we prepare.

Density and Open Space

Residential complexes

Townhouses, flats and cluster schemes. Unit layout, parking ratio, refuse points, and the split between private and communal open space.

Parking and Loading

Business and office parks

The bay count against the scheme’s ratio, visitor parking, loading provision, and how vehicles enter and leave without queuing on the street.

Drop-Off and Safety

Places of instruction

Crèches and schools. On-site drop-off and stacking, separation of pedestrians from vehicles, outdoor area and boundary treatment.

Vehicle Turning

Industrial and logistics

Turning circles, hardstand and service yards — the manoeuvring space a delivery vehicle actually needs rather than the space that looks sufficient.

Roads and Common Property

Estates and gated schemes

Internal road layout, access control, and what becomes common property. Where roads are to remain private, that is resolved in the SDP.

What You Are Paying For

What an SDP Shows

One drawing, carrying a great deal. Six things are shown on it — and one table, which is what the planner reads first.

01

Footprints and setbacks

Every building in position and dimensioned to the boundaries, with coverage and floor area calculated against what the scheme and the approval permit.

02

Access and internal circulation

Where vehicles enter and leave, how they move on site, and where pedestrians go. Sight lines at the access and the connection to the street are both assessed.

03

Parking, counted and dimensioned

The bay count against the required ratio, bay and aisle dimensions, visitor and accessible bays, and where loading takes place.

04

Refuse and servicing

Bin store positions, screening, and whether a collection vehicle can reach them without reversing the length of the site.

05

Landscaping and buffers

Planted areas, the buffers the approval requires to particular boundaries, and how much of the site remains soft.

06

Levels and stormwater

Existing and proposed levels, retaining where the site falls, and how stormwater is attenuated and discharged.

An SDP is read against the conditions, one by one. We set them out as a schedule on the drawing — the condition as written, and where on the layout it is answered — so the planner assessing it is not left to hunt. In our experience that single table does more for a first-pass approval than anything else in the submission.

The Process

From Conditions to Approval

Five phases, and the first is reading rather than drawing. What the approval requires determines what can be laid out.

01.

Conditions review

The approval is read in full and every condition bearing on the layout extracted — parking ratio, buffers, access position, open space, phasing.

02.

Layout

The scheme resolved against those conditions rather than against the site alone, with the compliance schedule built as the drawing develops.

03.

Lodgement

Lodged with the planning department, not with building control, together with whatever the approval requires to accompany it.

04.

Approval

Stamped and returned. From this point the SDP is the framework, and what is built has to sit inside it.

05.

Building plans

The set is drawn to conform to the approved SDP and lodged with building control, where it is checked against the layout as approved.

The SDP comes first, and once approved it becomes the framework the building plans have to conform to. That is worth knowing at layout stage: an SDP drawn tighter than it needs to be constrains every drawing that follows, and amending it later is a fresh application.

Fees and Charges

What an SDP Costs

Modest against the scheme it unlocks, and driven more by the conditions than by the site. Traffic, landscape and stormwater input is commissioned separately where the approval requires it. Four things move the figure.

01

Site size and unit count

A five-unit cluster and a two-hundred-unit estate are different exercises. Every unit adds parking, refuse, circulation and open space to be resolved and shown.

02

How prescriptive the conditions are

Some approvals impose a handful of conditions. Others run to pages, each of which has to be demonstrated on the drawing and answered in the schedule.

03

Specialist input

A traffic impact assessment, a landscape layout or a stormwater management plan, where the approval calls for one. Each is a separate appointment.

04

How much the scheme moves

An SDP tracks the development it describes. Where the unit mix, the access or the phasing changes during design, the layout and the schedule move with it.

Set it against a project that cannot move. Until the SDP is approved the building plans will not be considered and the approval it sits under cannot be given effect, so every cost on the scheme runs while nothing progresses. It is usually the smallest drawing on a project and the one holding the rest of it.

Either Side of It

Related Services

An SDP does not arise on its own. Three approvals impose them, and one thing follows.

Rezoning

The approval that most often imposes a Site Development Plan (SDP). The conditions attached to it are the brief the layout has to answer.

Rezoning >

Consent Use

A consent granted subject to conditions often requires an SDP before it can be given effect — most commonly on schools, crèches and guest houses.

Consent Use >

Township Establishment

At township scale the layout is the application. Where a township approval imposes an SDP over a portion of it, the two have to read consistently.

Township Establishment >

Building Plans Preparation

What follows. The drawings are prepared to conform to the approved Site Development (SDP), because building control checks them against it.

Building Plans Preparation >
Common Questions

SDP Questions

What developers and architects ask us about getting a layout approved.

Question not answered here?

Send us the erf number and your conditions of approval.

What is the difference between an SDP and a site plan?

The site plan is one sheet inside a building plan submission — the erf, the building's position on it, and enough for building control to check setbacks and coverage. An SDP is a separate document, lodged with and approved by the planning department, showing how the whole site works: access, circulation, parking, refuse, landscaping and levels. It is assessed against the conditions of your land use approval rather than against the building regulations, and it comes first.

Do I need an SDP for a single house?

Usually not. SDPs attach to schemes where the site as a whole has to be resolved — multiple units, multiple buildings, or a use carrying parking, access and servicing implications. A single dwelling on a residential erf is dealt with through the site plan in the building plan set. The exception is where your zoning or your approval says otherwise, which is why the conditions are worth reading before assuming.

Can I lodge building plans while the SDP is pending?

You can lodge them, but where an SDP is required they will not be considered until it has been approved — and a set waiting on something else is a set that has not started its statutory clock. The better sequence is to get the SDP approved and lodge plans drawn to it. Where the programme is tight, the two can be prepared in parallel and lodged in order.

Do the building plans have to match the SDP exactly?

They have to conform to it. Minor differences are generally tolerated where the approved layout is not compromised — a window moved, an internal wall shifted. A change to what the SDP actually fixes is different: move a building, reduce the parking, relocate the access or cut the landscaped area, and the plans no longer conform to what was approved. That needs the SDP amended before they can go in.

Can an approved SDP be amended?

Yes, but it is a fresh application rather than a correction. The amended layout is lodged, assessed against the same conditions, and approved or not on its own merits. That is worth anticipating at layout stage: an SDP drawn with some tolerance where the conditions permit it is considerably easier to live with than one fixed to the millimetre.

How long does SDP approval take?

Less than a land use application, and more than most clients expect. It is assessed by the planning department against the conditions, which means the time turns on how clearly the drawing demonstrates compliance rather than on the size of the scheme. A layout with a schedule answering each condition in order moves faster than one the assessing planner has to interrogate. We give you a realistic figure for your municipality at the outset.

Should an architect or a planner prepare it?

Both disciplines are in it, which is the awkward part. The drawing is architectural — footprints, levels, circulation, landscaping — but what it has to satisfy is planning: your conditions of approval, the scheme's parking ratio, the buffers and open space the municipality imposed. An architect who has not read the approval draws the wrong thing; a planner who cannot draw the layout produces a description rather than a plan. We prepare them with both in the room, which is the short answer to why this sits where it does on our site.

Start a Conversation

Speak to a Planner

Send us the erf number and your conditions of approval. We will tell you what the layout has to answer, where the conditions leave you room, and what an approved SDP would take. Initial consultations carry no obligation.