Retrieval of Approved Building Plans

Retrieval of Approved Plans

What Council Still Holds

A local authority keeps a copy of every building plan it approves, and the records in Johannesburg go back decades. Owners routinely assume nothing exists for an older property, and something usually does; the original house, sometimes an addition from the seventies, occasionally a set nobody in the family remembers submitting. Finding it is a search rather than a request. Records are indexed by erf and township, and both change: townships are renamed, erven renumbered, properties consolidated and subdivided. A search that returns nothing under the current description is not proof that nothing was approved.

The Record and the House

A search returns what was approved, not what was built. The gap between the two is what most owners actually discover — a cottage, a covered patio, an enclosed stoep, none of it on the set the council holds.

When a Search is Needed

When You Need a Search

Almost every search starts because somebody else asked for the plans. In our experience these are the four.

You are selling

The conveyancer has asked for approved plans and you cannot find them. The most common reason a search starts, and usually the one with a date attached.

You are altering or extending

An architect drawing an addition needs the existing approved set to work from. Where none is found, the building has to be measured before anything new can be drawn.

A notice or a complaint

Establishing what was approved is the first step in answering a contravention notice. Sometimes the structure complained of turns out to have been approved all along.

A bank or insurer has asked

A bond application, a refinance, or a claim. Insurers in particular ask after an incident, which is a poor moment to discover there are no plans.

Before anything else, look in your own transfer file. Approved plans are often handed over at registration and filed with the deed, and a set you already own costs nothing to find. Where that comes up empty, the search starts with the property’s history rather than with its current erf number.

The Five Outcomes

What a Search Turns Up

A search has five possible answers, and only one of them closes the file. Knowing which you are likely to get changes what you budget for.

Nothing Further

A complete matching set

The archive holds the plans and what they show is what stands. Copies are obtained, certified where a bank or conveyancer requires it, and the matter closes.

Regularise

A set that no longer matches

The original house is on record; a cottage, a patio or an enclosure is not. What is unapproved is drawn as built and submitted.

Search the History

A set under an older description

Nothing under the current erf number, and a full set under the township’s previous name or the erf’s earlier one. Most nil returns end here.

Reconstruct

An incomplete record

Sheets missing from the archive copy, or microfilm too degraded to read. What survives is used and the rest is measured and redrawn.

Draw from Scratch

Nothing on record

A genuine nil return, after the history has been searched. The building is measured and as-built plans are prepared for approval.

What You Are Paying For

What a Search Covers

A search is archival work, and it starts with the property rather than with the plans. Six things are looked at.

01

The current description

Erf, portion and township as the title deed records them. The starting point, and often not the description the plans were filed under.

02

The township's history

Townships are renamed and re-proclaimed. A suburb that has been called three things since 1950 has records under all three.

03

The erf's history

Consolidations, subdivisions and renumbering. An erf that was two properties in 1970 may hold two sets of plans under two numbers.

04

The archive itself

Paper, microfilm and digital records of different vintages, indexed differently and held in different places. Knowing where a period is kept is half the search.

05

Approval dates against the building's age

Where a house predates the earliest record on file, that explains the gap rather than leaving it open. Age tells you what to expect to find.

06

The drawings against the building

A set retrieved is read against what stands. This is where the useful answer usually is, and it is the step most searches skip.

What you receive is not only a copy. It is the set as the council holds it, a note of what the search covered and what it did not, and a plain statement of where the drawings and the building differ. On a sale, that last part is what the conveyancer actually needs.

The Process

From the Deed to the Drawings

Five phases, and the search itself is the third. Most of the work is establishing what to search for.

01.

Property history

Every description the property has held — erf numbers, portions, township names — established from the deed and from what preceded it.

02.

Archive search

Each description searched against each record type for the periods that apply, rather than one lookup against the current erf number.

03.

Retrieval

What is found is obtained and copied, certified where a bank or a conveyancer requires it in that form.

04.

Comparison

The drawings read against what stands on the property, so the gap between the two is identified rather than assumed.

05.

The finding

A plain statement of what exists, what does not, and what has to happen next.

The older the building, the longer the search and the more likely the record is partial. Age is the best single predictor of how a search will go, and we can tell you what to expect before you instruct us.

Fees and Charges

What an SDP Costs

Modest against the scheme it unlocks, and driven more by the conditions than by the site. Traffic, landscape and stormwater input is commissioned separately where the approval requires it. Four things move the figure.

01

Site size and unit count

A five-unit cluster and a two-hundred-unit estate are different exercises. Every unit adds parking, refuse, circulation and open space to be resolved and shown.

02

How prescriptive the conditions are

Some approvals impose a handful of conditions. Others run to pages, each of which has to be demonstrated on the drawing and answered in the schedule.

03

Specialist input

A traffic impact assessment, a landscape layout or a stormwater management plan, where the approval calls for one. Each is a separate appointment.

04

How much the scheme moves

An SDP tracks the development it describes. Where the unit mix, the access or the phasing changes during design, the layout and the schedule move with it.

Set it against a project that cannot move. Until the SDP is approved the building plans will not be considered and the approval it sits under cannot be given effect, so every cost on the scheme runs while nothing progresses. It is usually the smallest drawing on a project and the one holding the rest of it.

Either Side of It

Related Services

An SDP does not arise on its own. Three approvals impose them, and one thing follows.

Rezoning

The approval that most often imposes a Site Development Plan (SDP). The conditions attached to it are the brief the layout has to answer.

Rezoning >

Consent Use

A consent granted subject to conditions often requires an SDP before it can be given effect — most commonly on schools, crèches and guest houses.

Consent Use >

Township Establishment

At township scale the layout is the application. Where a township approval imposes an SDP over a portion of it, the two have to read consistently.

Township Establishment >

Building Plans Preparation

What follows. The drawings are prepared to conform to the approved Site Development (SDP), because building control checks them against it.

Building Plans Preparation >
Common Questions

SDP Questions

What developers and architects ask us about getting a layout approved.

Question not answered here?

Send us the erf number and your conditions of approval.

What is the difference between an SDP and a site plan?

The site plan is one sheet inside a building plan submission — the erf, the building's position on it, and enough for building control to check setbacks and coverage. An SDP is a separate document, lodged with and approved by the planning department, showing how the whole site works: access, circulation, parking, refuse, landscaping and levels. It is assessed against the conditions of your land use approval rather than against the building regulations, and it comes first.

Do I need an SDP for a single house?

Usually not. SDPs attach to schemes where the site as a whole has to be resolved — multiple units, multiple buildings, or a use carrying parking, access and servicing implications. A single dwelling on a residential erf is dealt with through the site plan in the building plan set. The exception is where your zoning or your approval says otherwise, which is why the conditions are worth reading before assuming.

Can I lodge building plans while the SDP is pending?

You can lodge them, but where an SDP is required they will not be considered until it has been approved — and a set waiting on something else is a set that has not started its statutory clock. The better sequence is to get the SDP approved and lodge plans drawn to it. Where the programme is tight, the two can be prepared in parallel and lodged in order.

Do the building plans have to match the SDP exactly?

They have to conform to it. Minor differences are generally tolerated where the approved layout is not compromised — a window moved, an internal wall shifted. A change to what the SDP actually fixes is different: move a building, reduce the parking, relocate the access or cut the landscaped area, and the plans no longer conform to what was approved. That needs the SDP amended before they can go in.

Can an approved SDP be amended?

Yes, but it is a fresh application rather than a correction. The amended layout is lodged, assessed against the same conditions, and approved or not on its own merits. That is worth anticipating at layout stage: an SDP drawn with some tolerance where the conditions permit it is considerably easier to live with than one fixed to the millimetre.

How long does SDP approval take?

Less than a land use application, and more than most clients expect. It is assessed by the planning department against the conditions, which means the time turns on how clearly the drawing demonstrates compliance rather than on the size of the scheme. A layout with a schedule answering each condition in order moves faster than one the assessing planner has to interrogate. We give you a realistic figure for your municipality at the outset.

Should an architect or a planner prepare it?

Both disciplines are in it, which is the awkward part. The drawing is architectural — footprints, levels, circulation, landscaping — but what it has to satisfy is planning: your conditions of approval, the scheme's parking ratio, the buffers and open space the municipality imposed. An architect who has not read the approval draws the wrong thing; a planner who cannot draw the layout produces a description rather than a plan. We prepare them with both in the room, which is the short answer to why this sits where it does on our site.

Start a Conversation

Speak to a Planner

Send us the erf number and your conditions of approval. We will tell you what the layout has to answer, where the conditions leave you room, and what an approved SDP would take. Initial consultations carry no obligation.

35 Fricker Road, Illovo, Sandton · Site Development Plans across the Gauteng City-Region